
A. Existing Hydro Projects:
I. Major Hydro projects:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Kali Gandaki "A"
- 144000
- 2
- Marsyangdi
- 69000
- 3
- Kulekhani No. 1
- 60000
- 4
- Kulekhani No. 2
- 32000
- 5
- Trisuli
- 24000
- 6
- Gandaki
- 15000
- 7
- Modi Khola
- 14800
- 8
- Devighat
- 14100
- 9
- Sunkosi
- 10050
- 10
- Puwa Khola
- 6200
- Total
- 389150
II. Small Hydro Projects
a. Grid Connected
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Chatara
- 3,200
- 2
- Panauti
- 2,400
- 3
- Tatopani (Myagdi) (I + II)
- 2,000
- 4
- Seti (Pokhara)
- 1,500
- 5
- Phewa (Pokhara)
- 1,000
- 6
- Tinau (Butwal)
- 1,024
- 7
- Sundarijal
- 640
- 8
- Pharping***
- 500
- 9
- Jomsom **
- 240
- 10
- Baglung
- 200
- Total
- 12704
b. Isolated
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Heldung (Humla)
- 500
- 2
- Kalikot
- 500
- 3
- Accham
- 400
- 4
- Jhupra (Surkhet)***
- 345
- 5
- Darchula I and II **
- 300
- 6
- Khandbari**
- 250
- 7
- Bhojpur**
- 250
- 8
- Dhankuta***
- 240
- 9
- Phidim**
- 240
- 10
- Doti
- 200
- 11
- Jumla**
- 200
- 12
- Syarpudaha (Rukum) **
- 200
- 13
- Bajura
- 200
- 14
- Bajhang**
- 200
- 15
- Surnaiyagad (Baitadi)
- 200
- 16
- Dolpa
- 200
- 17
- Chaurjhari (Rukum) **
- 150
- 18
- Ramechhap
- 150
- 19
- Aarughat (Gorkha)
- 150
- 20
- Taplejung **
- 125
- 21
- Okhaldhunga **
- 125
- 22
- Terhathum**
- 100
- 23
- Rupalgad(Dadeldhura)
- 100
- 24
- Syangja***
- 80
- 25
- Manang
- 80
- 26
- Gorkhe (Ilam)***
- 64
- 27
- Helambu
- 50
- 28
- Chame
- 45
- 29
- Dhading
- 32
- Total
- 5676
III. Private Sector Hydro Projects:
a. Existing (Isolated)
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Namche (KBC)
- 600
- 1
- Salleri (SCECO)
- 400
- Total
- 1000
b. Independent Power producers (IPPs) connected to INPs:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Khimtikhola (HPL)
- 60,000
- 2
- Bhotekoshi (BKPC)
- 36,000
- 3
- Chilime (CPC)
- 20,000
- 4
- Jhimruk (BPC)
- 12,000
- 5
- Indrawati III (NHPC)
- 7,500
- 6
- Andhikhola (BPC)
- 5,100
- 7
- Khudi Khola (Khudi HP)
- 3,450
- 8
- Piluwa Khola (AVHP)
- 3,000
- 9
- Sunkoshi Small (SHP)
- 2,500
- 10
- Thoppal Khola (THP)
- 1,650
- 11
- Chaku Khola (APCo)
- 1,500
- 12
- Pheme Khola (KHP)
- 995
- 13
- Baramchi (UH)
- 980
- 14
- Sisne Khola (GBHP)
- 750
- 15
- Rairang (RHPD)
- 500
- 16
- Salinadi (KSHPS)
- 232
- 17
- Sange Khola (SHP)
- 183
- Total
- 156340
B. Hydro Projects in Under Construction:
a. Major Hydro Projects:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Upper Tamakoshi
- 309,000
- 2
- Middle Marsyangdi
- 70,000
- 3
- Chamelia
- 30,000
- 4
- Kulekhani No 3
- 14,000
- 5
- Gamgadhi
- 400
- Total
- 423400
b. Independent Power producers (IPPs)
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Lower Indrawati (SHP)
- 4,500
- 2
- Mardi Khola (GHP)
- 3,100
- 3
- Ridi Khola (RHPD)
- 2,400
- 4
- Pati Khola (UHP)
- 996
- 5
- Upper Handi Khola (CPDS)
- 991
- 6
- Seti -2 (THP), Kaski
- 979
- Total
- 12966
C. Hydro Projects in Preliminary Works in Progress:
a. NEA Joint Venture under Public Private Partnership Program:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Upper Karnali
- 300,000
- Total
- 300,000
b. Private Sector Hydro Projects:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Upper Modi (GITEC)
- 14,000
- 2
- Madi-I (AGPLtd.)
- 10,000
- 3
- Mailung Khola (MKPC)
- 5,000
- 4
- Daram Khola (GHP)
- 5,000
- 5
- Lower Nyadi (BHP)
- 4,500
- 6
- Upper Mai Khola (ENDE)
- 3,100
- 7
- Mai Khola (HDHC), Ilam
- 2,400
- 8
- Hewa Khola (Barun HPD)
- 2,400
- 9
- Fawa Khola (SHC), Taplejung
- 2,079
- 10
- Lower Chaku Khola (LBPN)
- 1,765
- 11
- Siuri Khola (NGPL)
- 990
- 12
- Lower Piluwa Khola (Baneshwor HP
- 990
- 13
- Tinaukhola Small (Namabuddha HP)
- 990
- 14
- Tadikhola (Adishakti Power)
- 970
- 15
- Narayani Shankar Biomass (TMB)
- 500
- 16
- Belkhu Khola (MFIC), Dhading
- 320
- Total
- 55,004
D. Hydro Projects in Planned and Proposed:
a. Major Hydro Projects:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Budhi Gandaki
- 600,000
- 2
- Upper Seti (Storage)
- 128,000
- 3
- Seti Trishuli (Storage)
- 128,000
- 4
- Upper Trisuli 3 'A'
- 60,000
- 5
- Upper Modi ‘A’
- 42,000
- 6
- Upper Trisuli 3 'B'
- 37,000
- 7
- Rahughat Khola
- 30,000
- Total
- 10,25,000
b. Private Sector Hydro Projects:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Seti (West)
- 750,000
- 2
- Arun-3
- 402,000
- 3
- Upper Marsyangdi "A"
- 121,000
- 4
- Likhu - 4
- 120,000
- 5
- Kabeli 'A'
- 30,000
- 6
- Khimti II
- 27,000
- 7
- Balefi
- 20,000
- 8
- Upper Modi
- 14,000
- 9
- Madi-I (AGPLtd.)
- 10,000
- 10
- Daram Khola (GHP)
- 5,000
- 11
- Mailung
- 5,000
- 12
- Lower Indrawati (SHP)
- 4,500
- 13
- Lower Nyadi (BHP)
- 4,500
- 14
- Fawa Khola (SHC), Taplejung
- 2,079
- Total
- 1,515,079
iv) Diesel Power Stations:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Duhabi Multifuel
- 39,000
- 2
- Hetauda
- 14,410
- Total
- 53410
v) Solar Power Stations:
- S.N.
- Hydro Projects
- Installed Capacity (kW)
- 1
- Simikot
- 50
- 2
- Gamgadhi
- 50
- Total
- 100
- Chisapani (Karnali) : 10,800 MW, Multipurpose
- Sapta Koshi, 3,300 MW, High dam, multipurpose
- Sun Koshi, Storage-cum-diversion
- Pancheshwar, 5,600 MW, High-dam, multipurpose
- Budhi Gandaki, 600 MW, High dam, Bid
- West Seti, 750 MW
- Upper Karnali, 480 MW, IPP India Bid
- Arun III, 403 MW , IPP India, Bid
Exports expand 36.2% in April; Govt says don't get excited
